Traverse City News and Events

Monitoring Work Starts Monday At Union Street Dam

By Beth Milligan | Nov. 20, 2021

Monitoring work will start Monday on the Union Street Dam in downtown Traverse City, according to a city release.

The city is contracting with engineering consultant AECOM to complete the work. According to City Director of Public Services Frank Dituri, because of pending litigation in the Michigan Court of Appeals, the planned $19.3 million reconstruction of the dam as part of the FishPass project “is experiencing delays that are beyond the city’s control and at this time have no determinable length.” Dituri previously noted that a recent state inspection of the dam “downgraded the rating of the dam to fair-to-poor condition,” and that “to continue to maintain public safety it is necessary to secure engineering consultant services to monitor the condition of the dam.”

AECOM will be completing work at the Union Street Dam site including:

> Establishing a topographic survey and survey monuments on the dam
> Investigating slope stability and seepage and monitor piezometer levels
> Evaluating spillway capacity
> Evaluating and planning for tree removal
> Monitoring and developing sheet pile gap closure
> Monitoring and plan for repair of concrete surfaces
> Inspecting submerged portions of the dam through dive/video inspections
> Updating the project operations and maintenance plan
> Conducting quarterly inspections of the dam and project structures, including survey of monuments

Initial work will require surveyors and engineers to be on-site to measure, document, and photograph the site. Additional work will set reference monuments with hand tools on existing structures. The geotechnical "slope stability" component of this work will require a drilling equipment truck and vehicles on-site to facilitate the installation of water level monitoring devices. Future monitoring will include specially trained divers, who will conduct an underwater dive to inspect subsurface components of the dam. The monitoring work will enable reproducible measurements which when compared can indicate any change or movement in the conditions of the dam.

Comment

Garfield Trustees Talk Phishing Scheme, Upcoming South Airport Work, Liquor License

Read More >>

Seattle On TVC Radar

Read More >>

Airport Police Investigation Leads to Arrest, Recovery of Stolen Property

Read More >>

Sidewalk Closures Raise Access, Mobility Questions

Read More >>

Traverse City Track Club To Hold Design Contest For Bayshore Race Shirt

Read More >>

TVC Sets September Record

Read More >>

TC Woman Arrested After Crashing Into Multiple Vehicles, Fleeing Deputies

Read More >>

Road Commission Eyes Ambitious Plan for Boardman Crossings

Read More >>

Front Street Projects Called Off; More Retail, Restaurant News

Read More >>

Twilight in the Tunnels of the Grand Traverse Commons

Read More >>

BATA to Offer Free Rides on Election Day

Read More >>

What’s Next for Bluff Road, Hammond/Three Mile & More Road Commission Projects

Read More >>

This Emergency Physician Wants to Give Traverse City a Window into the Music Industry

Read More >>

City Making Improvements to East Side Social District

Read More >>
↑